Become A Dealer Get an Estimate 877-929-7665
Toggle search
Search all things Thursday Pools
  • Why Thursday Pools
    About Us Meet The Team Thursday Pools Story Why Buy Thursday Pools Our Innovations Our Process Dealer Testimonials
  • Pools
    Fiberglass Pool Designs Rectangle Fiberglass Pools Freeform Fiberglass Pools Roman Fiberglass Pools Plunge Pool Series Fiberglass Pool Colors Pocket Pools Idea Gallery
  • Learning Center
    Learning Guides How to Buy an Inground Pool: Free Buyer’s Starter Guide Fiberglass Pools: Everything You Need To Know Before You Buy How Much Does a Fiberglass Pool Cost? Fiberglass Pool Cost By State Comparing Fiberglass, Vinyl, and Gunite Options How Much Does An Inground Pool Cost? Pool Financing: A Homeowner’s Guide to Paying for a Pool Fiberglass Pool Blog
  • Resources
    Fiberglass Pool Care Guide Water Safety Press Room Pool Specifications Warranty Registration and Acknowledgement Agreement Owner’s Manual Warranty
  • Contact Us
    Contact a Dealer Get an Estimate Become a Dealer How are we doing? Careers Service Request
  • Pool Cost Calculator
  • 2026 Brochure
Become A Dealer Get an Estimate Dealer Login
Thursday Pools Caribbean Sparkle Lil Bob pool with water features
Thursday Pools Caribbean Sparkle Lil Bob pool with water features

Change Order Form

Share
Thursday Pools Headquarters

840 Commerce Parkway, Fortville, Indiana 46040

T: 877-929-7665

Monday-Friday: 8am-5pm EST


Get a Pool Estimate!

Terms & Conditions

Privacy Policy

Thursday Pools manufactures fiberglass pools and distributes them through an independent dealer network. The relationship between Thursday Pools and a dealer is that of an independent contractor.

Handrail, rope with floats, and safety equipment may have been removed for photography purposes. Thursday Pools requires that all pool installations install a handrail and comply with all federal, state and local building codes.

Due to the growth of the Thursday Pools brand, this website contains an abundance of information that has been created over the last decade. Some of the content on this site may reflect prices, perspectives, processes, entities, and names that were relevant at the time but may not be as relevant today. Consumers should consult their local independent dealer for the most accurate and updated information based on the unique conditions of their property. Consumers should verify specifications with the installing dealer rather than relying on the information on this website, which is not intended to be a final specification. Dimensions shown are for marketing and planning purposes only. Actual lengths, widths and depths may vary by approximately 2–3% due to rounding and normal manufacturing tolerances. Actual dimensions of the delivered pool shell govern. Homeowners and installers should confirm all critical measurements on the actual pool shell prior to installation.

Website by MediaFuel

  • Thursday Pools ISO-logo
  • Thursday Pools ISO environmental icon
  • ICC ES logo